sheridan Physical Therapy Building

Project: Commercial Steep Slope Roof Replacement
Roof Type: TPO Membrane – Mechanically Attached
Product: Mule-Hide 60mil
Completion Timeline: 4 days
Other Service Provided for This Project: Detach and reset parapet cap flashing | Lift and reset HVAC units

Commercial low slope TPO roofing. Several leaks identified. Low slope roof replacement on the south side of the building using TPO 60 mil membrane mechanically attached. HVAC systems had to be detached and lifted in order to install PVC membrane roof. Business was not interrupted during installation.

Contact us BACK TO ALL PROJECTS